FLEX

National Grid

Location:
TGS Automotive Group Conversion Centre, Bristol

Overview:

National Grid required 3 x Isuzu D-Max pickups converted in a very short turnaround, including eye wash station, first aid kit, interior and exterior lighting, and full corporate livery including Chapter 8 chevrons.

Click to enlarge

Solution:

With FLEX being based onsite at TGS Automotive Group’s conversion facility in Bristol, we have the flexibility to work alongside the conversion teams on the production  lines. We produced and fitted the full corporate livery, including reflective National Grid logos made with specialist materials, and R3B compliant prismatic grade chevrons on the rear, to meet National Grid’s requirements both from a specification and lead time perspective.

Key Stats

  • 3 x Vehicles
  • 2-Day Turnaround
  • Specialist Reflective Materials

Result:

National Grid had the 3 x Isuzu D-Max pickups converted in record time, with full corporate livery and chevrons to reflect their brand wherever they go, and ensure compliance with road safety standards.

GET IN TOUCH

Speak to
an expert

Call us on 0117 965 9965 to talk to one of our Sales Consultants about how we can maximise the efficiency of your fleet.

GET IN TOUCH

Enquire Now

Call us on 0117 965 9965 to talk to one of our Sales Consultants about how we can maximise the efficiency of your fleet.